Albemarle

albemarle-building-int-4319-(ZF-10445-23699-1-024).jpg

This 12 story, 190,000 square foot building had remained largely unchanged since it was built in 1970. and it showed. 

Now, the office floors have an open floor plan design that brings sunlight into the spaces throughout the building, and created rooms for employee collaboration.  With the renovation, all asbestos was abated and new mechanical, electrical and plumbing systems installed. That included a new fire alarm and sprinkler system, energy improvements, ADA compliant restrooms and new data and phone wiring.


Shuckin' Shack Oyster Bar

DSC_1328.jpg

The renovation Project required significant repair of the wood structure and the addition of steel beams to support the floor above.

Only the wood on the wall and exposed brick remain of the original interior. This project was our first collaboration with the Shuckin' Shack Franchise.


North Strand Nissan

north-strand-nissan-int_5512-(ZF-1542-89748-1-010).jpg

North Strand Nissan was anew ground-up construction project of a 27,419 square foot, two story automotive dealership.

The project followed the NREDI 1.5 Standards. The dealership consists of a showroom, a customer lounge, new car delivery space and state of the art service bay and detail shop. The structure sat among a larger area lot for vehicle display, customer and employee parking.


Beaverdam Elementary School

beaverdam-int-3907-(ZF-4699-81083-1-006).jpg

This brand new 110,000 square foot building was constructed with CMU and conventional steel components.  

The project included complete turnkey site construction of an 18.25-acre site that included all site infrastructure, site utilities, city streets and NCDOT roadway improvements.


River Bend Middle School

m13-riverbend-ext-3570b-(ZF-10445-23699-1-020).jpg

This prototype three-story, 1,280-student Middle School was built near Riverbend Elementary in northeast Raleigh. It was constructed with CMU and conventional steel components.

The project included a completed turnkey site construction of a 23-acre site that included all site infrastructure, site utilities, city streets and NCDOT roadway improvements.


Laney High School

Laney-high-school-ext_5848-(ZF-10445-23699-1-009).jpg

The new 1,600 seat, 60,000 square foot gymnasium features renovated locker rooms, new coaches offices, and a new lobby with a concessions area and public restrooms.  

And the new media center totals 11,100 square feet and features a “maker-space lab” for students to create hands-on, 3-D projects such as printing, sewing and soldering.


Northpark Church

4Q3A2825_7_8_9-Editweb.jpg

This new 2,800 square foot building was built in the location of a former facility on campus.

The modern structure includes a gathering space, fellowship hall, offices, and restrooms. Construction materials include wood studs and wood roof trusses with a corrugated metal panel exterior.