Life Science

Confidential Client Office

Confidential Client Office and QC Lab Interior Upfit

Concord, NC  

This interior buildout includes 120,000 SF of administrative offices, quality control laboratories, and site support amenities such as a cafeteria, dining area, coffee shop, meeting rooms, and health/fitness centers.


Central Harnett Health Cath Lab Expansion and Renovation

Central Harnett Health Cath Lab Expansion and Renovation

Lillington, NC

This highly sensitive healthcare project was a 1,500 SF renovation involving complete demolition of an existing operating room to convert into a new Cath Lab.  The project included new interior partitions, finishes and MEP systems.  The project also included complete medical gas systems, radiation protection, coordination and installation of GE Cath Lab Equipment and new control room for equipment.  This project was completed under stage IV ICRA plan and without disruption to the hospital operations.


Duke Marine Lab

Duke Marine Lab

Beaufort, NC 

Construction of stainless steel ductwork for new chemistry hoods in existing lab. Installation of new ERV in mechanical room and new controls and test and balance work on existing system.  Update existing lab for new professor. Included new countertops, rubber flooring, and light fixtures. Reused cabinetry. Additional outlets provided. 


Central Harnett Health Pharmacy Upgrades

Central Harnett Health Pharmacy Upgrades

lillington, NC

The renovation expanded the pharmacy’s capabilities with the addition of a new ante room and compounding rooms.  The scope included new interior finishes to create a sterile environment, touchless automatic door operators, and pass-through chambers.  The new mechanical system removes hazardous exhaust from the hoods and monitors the pressure differential between each room.  Work took place in an occupied hospital with the pharmacy in operation at all times.


Edgecombe Community College

ecc-biotech-twl-7464-(ZF-10445-23699-1-040).jpg

The state-of-the-art, 45,000-square-foot building is at the center of ECC’s health sciences degree programs.

The building, which serves more than 1,200 students annually, includes laboratory facilities and classrooms. The six training rooms on the first floor are furnished with pods to create a student-centered, active learning environment.

The second and third floors feature a simulated hospital environment, with rooms configured to simulate the real world environments of emergency rooms, operating rooms, intensive care units, labs, and more.


Phononic Devices

IMAG0629.jpg

This 15,000 square foot project includes 5,000 sq ft of office and 10,000 sq ft of clean-room space.  

The project scope included a new remote terminal unit and mechanical coordination and was completed 2 weeks ahead of schedule — without disruption to the existing operations.