K-12

Guilford County Peck K-8 Learning Center

Guilford County Peck K-8 Learning Center

Greensboro, NC 

This project includes a new three-story, approximately 140,000 SF K-8 Expeditionary Replacement Learning Magnet School with associated site improvements, site access, parking and complete system upgrades for the new K-8 school.


Brassfield Elementary School

Brassfield Elementary School

Raleigh, NC 

This project was the complete interior renovation of the existing 69,000 SF elementary school, including structural upgrades, all new MEP systems, all new interior finishes and exterior renovations.


Alston Ridge Middle School

Alston Ridge Middle School

Cary, NC 

The 226,465 SF, three-story middle school features athletic fields, an auditorium, a main gymnasium, an auxiliary gymnasium, a band room, a drama and dance studio, a media center, a large cafeteria, and many collaborative work spaces for students. On-site and off-site construction consisted of grading, storm drainage, utilities, site improvements, paving, landscaping, and fencing. The new building features shallow CIP concrete foundations, structural steel, and load-bearing masonry structure. The building envelope consists of brick veneer on CMU masonry backup with 2-1/2” insulation, or brick veneer on metal stud backup with 3” insulation and Mod bit roofing over lightweight insulation concrete system. Typical building interiors include CMU partitions, GWB partitions and assemblies, acoustical ceilings, PLAM casework, painting, flooring, and building specialties.


Apex Friendship Elementary School

Apex Friendship Elementary School

Apex, NC 

The new 129,790 SF, three-level elementary school is equipped with a media center, gymnasium and auditorium, spacious lunchroom, music room, flex learning spaces, multiple playgrounds, and outdoor gathering areas for students. The design concept focuses on flexibility and features two distinct buildings: a single-story building containing the core functions and a Pre-K/ Kindergarten wing. The core is divided into four quadrants organized around a clerestory lit commons. This serves as a lobby for the administration, cafeteria, and multi-purpose Room. First through fifth-grade classrooms are housed in a separate three-story building. Specialized classrooms and learning commons are equally distributed throughout both buildings. The school serves a population of 800 students. On-site and off-site construction consisted of grading, storm drainage, utilities, site improvements, paving, landscaping, retaining walls, and fencing.


West Mecklenburg High School Gymnasium

West Mecklenburg High School

Charlotte, NC

This project included 35,000 SF of new High School gymnasium. Project included all new ticketing and concessions with state-of-the art locker rooms.


Barton Pond Elementary School

Barton Pond Elementary

Raleigh, NC

Barton Pond Elementary School was constructed on a new site of approximately 35 acres in Raleigh, NC. On-site and off-site construction consisted of grading, storm drainage, utilities, site improvements, paving, landscaping, and fencing. The first floor includes both administration and student services spaces along with a media center, a 300-seat cafeteria, numerous multi-purpose play areas, resource rooms, art and music classrooms, and classrooms for kindergarten, first-grade, and second-grade students. The second floor includes classrooms for third, fourth, and fifth-grade students as well as additional resource rooms. The school is made up of three classroom wings that branch from the main core curriculum and administrative spaces. Each wing includes learning commons and flex spaces. The new building is a 108,530-square-foot, two-level elementary school with shallow CIP concrete foundations, and structural steel with some load-bearing masonry structure.


Fuquay Varina High School

Fuquay-Varina High School

Fuquay-Varina, NC

This project included 380,000 SF of new construction and associated athletic facilities. The school design called for salvaging Buildings E and F and re-imagining the 50-acre site by constructing a state-of-the-art facility featuring 112 teaching spaces in a new four-story academic wing with two towers. The renovation included the addition of open collaborative spaces throughout, enabling better circulation of traffic and increased natural light. This newly renovated school boasts large and well-equipped classrooms and lab spaces, a new auditorium, an updated gymnasium with new locker and weight rooms, new drama and band rooms, a greenhouse, updated athletic fields and facilities, increased parking, and improved vehicular circulation.


Southeast Raleigh YMCA

J Sink20.JPG

This New YMCA.


South Mecklenburg High School

south-mecklenburg-hs-clt-ext-3918-(ZF-5284-73464-1-002).jpg

South Mecklenburg High School Expansion

Charlotte, NC

The South Mecklenburg High School Renovation and Expansion project in Charlotte, NC, replaced the two oldest buildings on campus, which date back to the school’s original construction in 1958. The 13,000-square foot renovation includes an upgrade to the existing cafeteria and addition of new cafeteria and kitchen space. The new 44,000-square foot classroom building features 30 additional classroom spaces to accommodate the school’s growing population.


Beaverdam Elementary School

beaverdam-int-3907-(ZF-4699-81083-1-006).jpg

This brand new 110,000 square foot building was constructed with CMU and conventional steel components.  

The project included complete turnkey site construction of an 18.25-acre site that included all site infrastructure, site utilities, city streets and NCDOT roadway improvements.


River Bend Middle School

m13-riverbend-ext-3570b-(ZF-10445-23699-1-020).jpg

This prototype three-story, 1,280-student Middle School was built near Riverbend Elementary in northeast Raleigh. It was constructed with CMU and conventional steel components.

The project included a completed turnkey site construction of a 23-acre site that included all site infrastructure, site utilities, city streets and NCDOT roadway improvements.


Laney High School

Laney-high-school-ext_5848-(ZF-10445-23699-1-009).jpg

The new 1,600 seat, 60,000 square foot gymnasium features renovated locker rooms, new coaches offices, and a new lobby with a concessions area and public restrooms.  

And the new media center totals 11,100 square feet and features a “maker-space lab” for students to create hands-on, 3-D projects such as printing, sewing and soldering.


\\